home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V12_0 / V12_021.ZIP / V12_021
Internet Message Format  |  1991-07-08  |  16KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/EaZ3TDm00VcJ0=Sk55>;
  5.           Fri,  6 Jul 1990 03:03:44 -0400 (EDT)
  6. Message-ID: <IaZ3SmC00VcJ8=R04N@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Fri,  6 Jul 1990 03:03:15 -0400 (EDT)
  12. Subject: SPACE Digest V12 #21
  13.  
  14. SPACE Digest                                      Volume 12 : Issue 21
  15.  
  16. Today's Topics:
  17.            Payload Status for 07/05/90 (Forwarded)
  18.            Re: grim tidings for the future
  19.            Re: grim tidings for the future
  20.     (Abberated) Reflections on the Hubble Space Telescope
  21.               Re: Nasa's budget
  22.               Re: Nasa's budget
  23.              Re: realities of testing HST
  24.                   Hubble Q&A
  25.  
  26. Administrivia:
  27.  
  28.     Submissions to the SPACE Digest/sci.space should be mailed to
  29.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  30.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  31.              tm2b+@andrew.cmu.edu
  32.  
  33. ----------------------------------------------------------------------
  34.  
  35. Date: 5 Jul 90 18:18:32 GMT
  36. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  37. Subject: Payload Status for 07/05/90 (Forwarded)
  38.  
  39.  
  40.     Daily Status/KSC Payload Management and Operations 07-05-90.
  41.     
  42.     
  43.     - STS-35 ASTRO-1/BBXRT (at OPF) -
  44.     
  45.     Experiment monitoring continues.  Preps in work to support
  46.     BBXRT battery removal tomarrow.
  47.     
  48.     
  49.     - STS-37 GRO (at PHSF) -
  50.     
  51.     Test batteries will not be discharged today; awaiting
  52.     possible manifest/schedule impacts.
  53.     
  54.     
  55.     - STS-40 SLS-1 (at O&C) -
  56.     
  57.     GTA pressure monitoring, MLI installation and installation
  58.     of flight caps on experiment subsystem computers continues
  59.     today.
  60.     
  61.     
  62.     - STS-41 Ulysses (at Hanger AO) -
  63.     
  64.     At the VPF, prechecks of electrical test equipment and
  65.     software validation continue today to support CITE testing.
  66.     
  67.     
  68.     - STS-42 IML-1 (at O&C) -
  69.     
  70.     Rack, floor, and module staging is continuing.
  71.     
  72.     
  73.     - Atlas-1 (at O&C) -
  74.     
  75.     Temperature sensors and cables will be installed today.
  76.     
  77.     
  78.     - STS-46 TSS-1 (at O&C) -
  79.     
  80.     EMP paper closure continues.
  81.     
  82.     
  83.     - STS-47 Spacelab-J (at O&C) -
  84.     
  85.     Rack staging continues.
  86.     
  87.     
  88.     - HST M&R -
  89.     
  90.     Work off PR'S scheduled for today.
  91.  
  92. ------------------------------
  93.  
  94. Date: 5 Jul 90 22:41:16 GMT
  95. From: swrinde!zaphod.mps.ohio-state.edu!samsung!umich!csd4330a!newsserv!wright@ucsd.edu  (Tim Wright)
  96. Subject: Re: grim tidings for the future
  97.  
  98. In article <11053@hydra.gatech.EDU> ccoprmd@prism.gatech.EDU (Matthew DeLuca) writes:
  99.  
  100.  
  101.  
  102.    Oh, we have plenty of launch capacity...go to any of the commercial 
  103.    rocket manufacturers here in the U.S., and they'll sign you up in no 
  104.    time.  I firmly believe that we are well past they days of the many cheap
  105.    probe tactic...we've done a lot of the easy science now, and it's the 
  106.    co-ordinated findings from several instruments simultaneously that we're
  107.    looking for.  Perhaps if our planetary program was in the situation of the 
  108.    Soviets, (probes break a lot more than they work) this would make sense, 
  109.    but I have no qualms with the way we do our probes.  It would be nice if 
  110.    we could rework the funding process for them, but that's not NASA's fault.
  111.  
  112. Unfortunately, as I understand it, NASA has the launching facilities.  So they
  113. control who goes.  When the shuttle is delayed that pushes back all other
  114. launches.  It takes days to reconfigure the system for new launches.  So how
  115. can a company run an effective launching business if their success depends 
  116. so much on NASA?
  117.     People go to other countries more reliable, cheaper launching systems.
  118.  
  119.     
  120. --
  121.                                      Tim Wright
  122.                          ERIM
  123.                                      Ann Arbor, MI
  124.                                      wright@sed4330a.erim.org
  125.  
  126. ------------------------------
  127.  
  128. Date: 5 Jul 90 19:04:17 GMT
  129. From: mojo!SYSMGR%KING.ENG.UMD.EDU@mimsy.umd.edu  (Doug Mohney)
  130. Subject: Re: grim tidings for the future
  131.  
  132. In article <14997@thorin.cs.unc.edu>, leech@homer.cs.unc.edu (Jonathan Leech) writes:
  133. >>Funny how all those projects were successful on economy budgets rather than
  134. >>deluxe class "big science" tickets.
  135. >
  136. >    You think Galileo is on an economy budget?    Try again.
  137.  
  138. Compared to what? Hubble?
  139.  
  140. ------------------------------
  141.  
  142. Date: 4 Jul 90 22:18:46 GMT
  143. From: mcsun!ukc!servax0!Sol27!jonea@uunet.uu.net  (Jones A G)
  144. Subject: (Abberated) Reflections on the Hubble Space Telescope
  145.  
  146.  
  147.  
  148. How to make your own Space Telescope
  149. ------------------------------------
  150.  
  151.  
  152. To create your own working Space Telescope, just following these simple steps:
  153.  
  154.  
  155. 1.    Design a Little Space Telescope.
  156.  
  157. 2.    Send the Little Space Telescope up into Space.
  158.  
  159. 3.    Look through it.  What do you see?  Please choose your answer from the 
  160.     following options:
  161.  
  162.     a)    A lot of pretty stars.
  163.  
  164.     b)    A lot of not-very-pretty, blurry stars.
  165.  
  166.     c)    A large, angry gorilla beating its chest and making strange,
  167.         unearthly faces.
  168.  
  169. 4.    If your answer was 'a', you may now make a Big Space Telescope and 
  170.     proceed into the wonderful world of astronomy.
  171.  
  172.     If your answer was 'b', go back to stage 1 and try again until you
  173.     understand all the problems.
  174.  
  175.     If your answer was 'c', you didn't follow the instructions properly -
  176.     instead you constructed a Little Spaced-out Telescope.  You may now
  177.     apply for a senior post at NASA, where strange men in white coats will 
  178.     look after you and cater for your every wish - no matter how much it 
  179.     costs.
  180.  
  181.  
  182. _______________________________________________________________________________
  183. Alun.
  184.  
  185. PS   If you want to flame me, my address is fred@hell.and.back, and if you 
  186. don't, its jonea@essex.ac.uk.
  187.  
  188. ------------------------------
  189.  
  190. Date: 5 Jul 90 15:46:26 GMT
  191. From: xanth!xanth.cs.odu.edu!paterra@mcnc.org  (Frank C. Paterra)
  192. Subject: Re: Nasa's budget
  193.  
  194. In article <5436@itivax.iti.org> aws@vax3.iti.org (Allen W. Sherzer) writes:
  195. thorin!grover!beckerd@mcnc.org  (David Becker) writes:
  196.  
  197. >>Could cutting the Shuttle and cancelling Freedom actually help space
  198. >>explotation?  
  199.  
  200. >Yes. The shuttle is the high cost way to space. Expendables can provide
  201. >the same service for far less cost. In addition, the Shuttle wiht it's
  202. >first say on facilities makes it a lot harder to launch commercial
  203. >expendables which would reduce costs even more (mass production and
  204. >learning curve). If we ran access to space the way Ariane does, the
  205. >cost of getting to LEO would be cut in half almost overnight.
  206.  
  207. Expendible may be cheaper, but without any sort of space station
  208. currently, the shuttle is our only way of performing manned experiments
  209. in space.  One could argue that manned experiments are a waste of time
  210. and money, but if they are really needed, then we need the shuttle.
  211. Of course we could design a man-rated re-entry vehicle that could be
  212. launched on an expendible, but that won't be cheap either
  213.  
  214. >As to Freedom, that program is totally out of control. Tim Kyger told
  215. >me earlier this week that the number of shuttle filghts to do assembly
  216. >(not counting resuply) is about to double. They are about to start another
  217. >rescoping and redesign. (I'll post details later).
  218.  
  219. Totally out of control.
  220. --
  221. Frank Paterra
  222. paterra@cs.odu.edu
  223.  
  224. ------------------------------
  225.  
  226. Date: 5 Jul 90 20:07:17 GMT
  227. From: usc!cs.utexas.edu!mailrus!umich!ox.com!itivax!vax3.iti.org!aws@ucsd.edu  (Allen W. Sherzer)
  228. Subject: Re: Nasa's budget
  229.  
  230. In article <PATERRA.90Jul5114626@nut.cs.odu.edu> paterra@cs.odu.edu (Frank C. Paterra) writes:
  231. >>Yes. The shuttle is the high cost way to space. Expendables can provide
  232. >>the same service for far less cost.
  233.  
  234. >Expendible may be cheaper, but without any sort of space station
  235. >currently, the shuttle is our only way of performing manned experiments
  236. >in space.  
  237.  
  238. Agreed. In a few years we could design a Apollo like Command Service
  239. Module. Let's say that costs $500M to build (I suspect it could be
  240. done for less). Then we spend another $500M to produce a heavy lift
  241. vehicle (Martin Marietta has already proposed to do this) which can
  242. lift 100,000 pounds. Finally, we spend another $500M building the LLNL
  243. space station. 
  244.  
  245. We would then have the needed capability for $1.5 billion. Each launch
  246. would cost $150M which is half the cost of the shuttle (and would get
  247. lower as the learning curve is traversed). This entire system would
  248. be paid for from the savings of not using the shuttle. It would take
  249. about a year to pay for itself.
  250.  
  251. >One could argue that manned experiments are a waste of time
  252. >and money, 
  253.  
  254. Which I would not. Indeed I would like to see affoardable systems
  255. so we can fly more manned experiments. As long as the shuttle is there,
  256. it won't happen.
  257.  
  258. >Of course we could design a man-rated re-entry vehicle that could be
  259. >launched on an expendible, but that won't be cheap either
  260.  
  261. See  above. How long did it take to design and build the Apollo CSM?
  262.  
  263.    Allen
  264. |                          |      In War: Resolution                      |
  265. | Allen W. Sherzer         |      In Defeat: Defiance                     |
  266. |   aws@iti.org            |      In Victory: Magnanimity                 |
  267. |                          |      In Peace: Good Will                     |
  268.  
  269. ------------------------------
  270.  
  271. Date: 6 Jul 90 03:51:49 GMT
  272. From: usc!cs.utexas.edu!news-server.csri.toronto.edu!utgpu!utzoo!henry@ucsd.edu  (Henry Spencer)
  273. Subject: Re: realities of testing HST
  274.  
  275. In article <269351E3.6A88@tct.uucp> chip@tct.uucp (Chip Salzenberg) writes:
  276. >>"Can you please tell us why you awarded a contract for several hundred
  277. >>million dollars to a contractor that you now feel you cannot trust?"
  278. >
  279. >Trust but verify.
  280.  
  281. "If you trust them, sir, why do you need to spend money verifying that
  282. they have done what you claim you trust them to do?"
  283.  
  284. I understand the distinction; my point is that J. Worthless Congressthing
  285. doesn't.  (As witness some of the imbecilic pronouncements now coming out
  286. of Congressthings on the subject of HST.)  And you'd better believe that
  287. on a program suffering from serious cost overruns in a time of very tight
  288. NASA budgets, NASA cared about that viewpoint.
  289. -- 
  290. "Either NFS must be scrapped or NFS    | Henry Spencer at U of Toronto Zoology
  291. must be changed."  -John K. Ousterhout |  henry@zoo.toronto.edu   utzoo!henry
  292.  
  293. ------------------------------
  294.  
  295. Date: 6 Jul 90 04:14:19 GMT
  296. From: cs.utexas.edu!news-server.csri.toronto.edu!utgpu!utzoo!henry@tut.cis.ohio-state.edu  (Henry Spencer)
  297. Subject: Hubble Q&A
  298.  
  299. In article <9007051334.AA29826@alw.nih.gov> AZM@cu.nih.gov writes:
  300. >    * The error is in the primary mirror.
  301. >    * There IS ABSOLUTELY, POSITIVELY no backup primary mirror.
  302. >    * Kodak produced a backup primary mirror.
  303. >    * The problem is in the secondary mirror.
  304. >    * The problem is in BOTH the primary and secondary mirrors.
  305. >    * The problem is in the relative alignment of the mirrors.
  306.  
  307. I don't recall anybody saying it was an alignment problem, not after
  308. the true situation started to become apparent.  (There were early hopes
  309. that the persistent focusing trouble *was* just a question of needing
  310. better alignment, but nobody believes that now.)
  311.  
  312. Nobody knows for sure whether the problem is in primary or secondary or
  313. both, although last I heard there was reason to suspect the primary.
  314.  
  315. There is no primary backup in the sense of a complete, finished, ready-
  316. to-fly mirror.  Kodak did early work on a backup, and I think it still
  317. exists somewhere, but I don't think that went as far as final figuring
  318. and polishing.  In any case it's irrelevant, since replacing the primary
  319. in orbit is clearly impossible.  (I haven't seen a proof that replacing
  320. the secondary is impossible, although this definitely was not provided
  321. for in the design.)  Compensating for the problem in the instruments is
  322. probably easier, given that a visit will be needed to do anything anyway.
  323.  
  324. >    * The Hubble primary mission is SOMEWHAT impaired.
  325. >    * The "circle of confusion" produced by the primary
  326. >      Hubble mirror is considerably worse than that found
  327. >      in a $50. Sears toy telescope. Hubble is worthless.
  328.  
  329. I don't know where you heard the latter.  The imaging part of the mission
  330. is in big trouble except in the ultraviolet.  The non-imaging instruments
  331. (4 out of 6) are not hurt as badly, although opinions vary on just how
  332. severe the impact is on them.  There should still be enough worthwhile
  333. work for Hubble to keep it fully occupied, given how massively over-
  334. subscribed it was before.
  335.  
  336. >    * NASA has already shceduled a repair mission for 1993.
  337. >    * Neither the primary mirror, nor the secondary, can be
  338. >      repaired or replaced in orbit.
  339. >    * The repair mission is scheduled for 1994.
  340. >    * There will be NO repair mission of any kind.
  341.  
  342. Again, where did you hear that last?  That is the one that can definitely
  343. be ruled out, barring the faint possibility that imbeciles in Congress get
  344. the project killed based on stupid misconceptions.
  345.  
  346. Neither the primary nor the secondary is *designed* to be replaced in
  347. orbit.  (You can forget about repairing them except in a high-tech optics
  348. shop on the ground.)  Replacing the primary looks impossible.  Replacing
  349. the secondary is certainly difficult and perhaps impractical.  Dealing
  350. with the problem in the instruments is easier.
  351.  
  352. There was a 1993-4 visit scheduled for routine maintenance and installation
  353. of an upgraded WFPC.  This may or may not be rescheduled now.
  354.  
  355. >    * The cost of testing the mirror on Earth would have been
  356. >      "millions," "tens of millions," "hundreds of millions."
  357. >    * A simple foucalt tester, that every kid who has ever ground
  358. >      a mirror could build for a few bucks, would have easily
  359. >      detected this unbelievably huge error.
  360. >    * The mirror was not tested for reasons of economy.
  361. >    * The mirror was not tested for reasons of technological
  362. >      inadequacy (inability to simulate orbital zero-grav
  363. >      conditions).
  364. >    * The mirror was not tested because it was ground and
  365. >      polished so precisely that testing was deemed unnecessary.
  366. >    * The miror was tested, but the tests failed to reveal the
  367. >      error.
  368.  
  369. The mirror was tested, using tests that did not reveal the problem because
  370. they were based on the same faulty specifications.  (You can't grind a
  371. mirror without testing to see how you're doing, whether you are Perkin
  372. Elmer in a billion-dollar optics shop or Joe Doakes in his basement.)
  373. Testing the mirror precisely enough to reveal the very small errors
  374. that were expected would have been very expensive.  Tests that could
  375. have caught *this* error would have been easier, but nobody thought
  376. it very likely to be worth the trouble.  It is not unheard-of to build
  377. a telescope without doing an "all up" test on the entire optical system
  378. beforehand; none was done for Europe's New Technology Telescope.
  379.  
  380. >    * The Hubble sat on the ground ready for launch for the
  381. >      better part of 6 years waiting for launch, but was not
  382. >      tested for want of time.
  383. >    * The mirror was completed barely in time for launch, and
  384. >      testing was foregone to facilitate on-time launch.
  385.  
  386. There was ample time for mirror testing during the various delays, and
  387. the various schedule slips occurred well in advance, so nobody was ever
  388. racing against the clock, that I know of.  There *has* been a lot of
  389. work done during the delays, some of it very important as it turned out,
  390. but the optics haven't been messed with lately.
  391.  
  392. >To my nose, the whole thing is beginning to stink like some kind of
  393. >coverup, but if so, just what the h**l are they trying to cover up?
  394.  
  395. There is always somebody screaming "coverup" when all the facts are
  396. not instantly apparent.  Have some patience; mama can't bring you
  397. the Moon right away, she's got to figure out how to get there first.
  398. -- 
  399. "Either NFS must be scrapped or NFS    | Henry Spencer at U of Toronto Zoology
  400. must be changed."  -John K. Ousterhout |  henry@zoo.toronto.edu   utzoo!henry
  401.  
  402. ------------------------------
  403.  
  404. End of SPACE Digest V12 #21
  405. *******************
  406.